Bridge has submitted a Field Development Plan (FDP) to the OGA for the development of the Galapagos field in the Northern North Sea. Galapagos is at the heart of the Brent system of fields and is made up of a series of very large non-communicating compartments which means that the development will be done in phases allowing for rapid return on the initial investments.  The development will take place in two overall stages with stage 1 being developed through the provision of an FPSO with four sub-sea drilling centres.The Galapagos field development is currently being farmed down by Bridge as part of the financing process for the project.

Bridge hold 100% WI and are Operator:

  • Held under licenses P184 and P474, NW Hutton was discovered in 1975 and originally developed by Amoco.

  • World class Brent reservoir with Darcy sands and >500ft oil column. Oil reservoir in Mid Jurassic Brent sandstones, trapped in tilted fault bound terraces.

  • Previous production started in 1983, peaked at 86,500 bopd from 4 initial wells. 

  • Pre-FEED completed for wells, SPS and SURF and FPSO.

  • Competent Persons Report due shortly.

  • First oil planned for Q4 2021.